Flood in Bhutan

响应状态:已关闭

Unusually heavy rainfall in October 2025 caused severe flooding across Bhutan and parts of the eastern Himalayas. In western Bhutan, a technical failure at the Tala Hydropower Dam led the Wangchhu River to overflow its banks, prompting flood warnings downstream in India’s North Bengal Dooars region.

Precautionary evacuations in Bhutan prevented casualties from the dam incident, but rising river levels increased the risk of flash floods downstream. Landslides and flooding across Bhutan, northeast India, and Nepal caused significant damage, with at least 28 deaths reported in Darjeeling and over 60 fatalities across the wider Himalayan region.

Bhutan’s National Centre for Hydrology and Meteorology alerted Indian authorities to the potential flood risk, while India’s National Disaster Response Force remained on standby for relief and rescue operations. The flooding also affected tea plantations in North Bengal, inundating several estates and displacing thousands of people. With rainfall continuing, conditions remained critical and the risk of further flooding persisted.

事件类型
洪水, 山体滑坡
事件地点
Bhutan
启动宪章的日期
2025-10-07
宪章启动时间
13:49
宪章启动时区
UTC+07:00
宪章要求者
UNOSAT on behalf of UNOCHA
启动ID
993
项目经理
Jakrapong Tawala (UNITAR)
增值产品
  • MBRSC,
  • Ministry of Home Affairs,
  • Department of Local Governance and Disaster Management,
  • Karine Leal (INPE)

产品

3